In response to an emergency, CTI
deployed work crews to a bridge on New York’s Wantagh Parkway to systematically dismantle and remove the entire
360-foot-long span in just 14 days.
While your next project may not require such urgency, any job can
benefit from swift, exceptional service. Whether re-decking a
bridge, or completely removing the sub-structure beneath it, CTI
reduces construction time and minimizes traffic disruptions and
delays. |
 |
Our cutting and coring techniques have tackled 6-foot-thick
concrete arch and barrel vault structures, miles of runway surface
and lighting, and demolition work over busy roads and railways.



|
PROJECTS OF NOTE
FDR Bridge
New York, NY
Performed for NAB Construction
Scope: Cut and removed elevated road slab. CTI designed a support
system to hold cut slabs in place during live traffic operation.
Included replacement of deck with steel grid and concrete panels.
Route 46
Passaic, NJ
Performed for Anselmi & DeCicco
Scope: Cut, rigged and removed superstructure of 5-barrel arch
bridge.
65th Place Bridge
Queens, NY
Performed for AFC Enterprises
Scope: Cut concrete bridge deck over Long Island RR & Metro North
lines while railways were active.